[vc_row][vc_column][vc_column_text]

This option is used to copy models from another project into the current project. Including 12d Synergy Projects.

Continue down the page to see the Copy Project Models Panel options.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_separator border_width=”5″][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]To view the Copy Project Models Panel, Use: Models => Utilities => Copy Project Models
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”4902″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]Hit the <Source> button to select one of two options:

  • Direct Access on Local or Network Storage
  • Access via a 12d Synergy Data Management Server

For this example the <Direct Access on Local or Network Storage> option will be selected.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”6297″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]Hit the <Folder> button to select the project location, this will open a windows ‘Select Folder’ panel.

In this example the project to copy the data from is located on the C drive.

Once the project location has been selected, hit the <Select Folder> button to load the project into the panel. The project may have to be selected from a drop down list, however if you select the project folder (the .project folder) in windows the project will be loaded into the panel.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”6298″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]Tick the <Add data to existing models> option for the copied data to be added into the existing models.

Tick the <Clean data in existing models> option and the existing model/s will have their contents deleted before the copied data will be added into the model/s.

For this example the <Search/Replace> option is not utilised.The Search/Replace options on the Copy Project Models panel are explained in more detail on the Search and Replace Post:
Visit: Search and Replace

The Models from the selected project have been listed in the <Original Model Name> column in the panel.

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”6299″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]Tick the <Copy> column and the model will be copied into the current project.

Type in the <New Model Name> into the column next to the model to be copied, the copied data will be added into the newly created model/s in the current project.

Note: Any model/s displayed in the <Original Model Name> column that are coloured ‘yellow’ refers that the model name already exists in the current project.

Hit the <Copy> button to copy any selected/ticked models into the current project.

Hit the <Refresh> button to refresh the model list in the panel.

Hit the <Finish> button to close the panel.

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”6300″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

After the model/s are copied into the project, use the ‘Model Information Table’ to check that the model/s are now in the project. Use: Models => Model Information Table

If you would like to learn more about the Model Information Table and the options available,
Visit this post: Model Information Table

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”6301″ img_size=”full”][/vc_column][/vc_row][vc_row][vc_column][vc_separator border_width=”5″][/vc_column][/vc_row]